x
Breaking News
More () »

Weekly Road Closures: July 11 to July 17

The weekly road closures include locations of road construction and events where lane and street closures affect traffic flow along the City’s major streets.
Credit: WTOL

CORPUS CHRISTI, Texas — All closures are subject to change due to weather, emergency work, or other circumstances. 

The road closures for this coming week are as follows:

CITY PROJECTS

Ayers Street Pedestrian Improvement and Turn Lane – SPID to Gollihar Rd (E15106, Bond 2014)

Northbound Ayers Street is closed at the Crosstown/SPID Interchange (frontage road) intersection. Thru traffic is encouraged to seek alternate routes to access businesses in the area. Ayers Street is also reduced to one-lane, one-way traffic from Gollihar Road to McArdle Road (southbound direction only).

Additionally, RTA bus stops will be closed from Gollihar Road to SPID. Bus stops will remain open in the area of Port Ave and Ayers Street.

A list of all traffic changes are included below:

  • Johanna Street to Crosstown/SPID Interchange (Northbound)– The outside thru lane on Ayers Street will be closed approaching the Crosstown/SPID interchange. This lane closure will continue through the underpass of SPID. This closure will not impact access to the eastbound frontage road.
  • Johanna Street to Crosstown/SPID Interchange (Southbound) - The left turn lane and median openings will be closed.
  • Crosstown/SPID Interchange & Ayers Street Intersection (Northbound) – Northbound Ayers Street will be CLOSED at the Crosstown/SPID Interchange intersection. Motorists must use alternate detour routes such as the SH 286 northbound frontage road, Gollihar Road, Kostoryz Road, or McArdle Road to access local businesses.
  • Crosstown/SPID Interchange to McArdle Road – Ayers Street is CLOSED at McArdle Road to northbound thru traffic only. Thru traffic is required to follow the McArdle Road detour and avoid local and residential side streets. Travel lanes are reduced to one lane, in both the north and south directions, to provide access to local businesses in the area. 
  • McArdle Road to Gollihar Road (Southbound)- Ayers Street will be reduced to one lane, one-way traffic flow in the southbound direction only. Access to all local businesses is provided.
  • Ayers Street and Gollihar Road Intersection – The outside thru lane on Ayers Street, in the southbound direction only, will be closed approaching the Gollihar Road intersection. 
  • SH 358 Frontage Road (Eastbound) – The shared thru left turn lane will be closed.

Carroll Lane – McArdle Road to Houston Street (E13097, Bond 2014)

Carroll Lane is reduced to one-lane of travel, in the southbound direction, between Brawner Parkway and Gollihar Road.

Everhart Road – Holly Road to South Padre Island Drive (18014A, Type B)

Contractors are continuing improvements along the east side of Everhart Road requiring closures up to Corona Drive. Northbound and Southbound traffic are shifted to the southbound lanes (west side) and will be reduced to one lane in each direction between Holly Road and Corona Drive. Southbound traffic, between SPID and Corona Drive, will be reduced to one lane approaching the intersection at Corona Drive. The intersection of Curtis Clark Drive and Everhart Road (east side) is currently closed to eastbound traffic. Motorists may encounter delays.

Within the construction zone, there are left-turn restrictions at intersections. Left-turn movements are restricted for northbound Everhart Road traffic at Bonner Drive, Curtis Clark, and Corona Drive. Left-turn movements are restricted for southbound Everhart Road traffic at Holly Road Bonner Drive, and Curtis Clark.

The right turn lane on Holly Road is closed, but right turns onto northbound Everhart Road will still be allowed from the right travel lane.  

Flato Road – Bates Road to Agnes Street (E15110, Bond 2014)

Flato Road is reduced to one-lane, one-way traffic flow, in the southbound direction between Agnes Street and Bates Road.

Frio Street, Hacala Street, Dorado Street, Corridor – Greenwood Drive to Martin Street (E 18019A, Bond 2018)

Frio Street is closed from to Mission Drive to Hacala Street.

Holly Road - Rodd Field Road to Ennis Joslin Road (Type B)

Holly Road is temporarily closed from the intersection at Rodd Field Road to Silver Sands Drive in order to perform utility work. Traffic is reduced to only one-lane, one-way traffic flow, in the eastbound direction between Silver Sands Drive and Ennis Joslin. Residents that live between Silver Sands Drive and Ennis Joslin Road must use either Silver Sands Drive, Lexington Road, or Ennis Joslin Road to access their homes.

There is a temporary closure of Holly Road from Ennis Joslin Road to Halcon Street. Motorists traveling eastbound along Holly Road will be detoured northbound or southbound onto Ennis Joslin Road. Two-way traffic will be maintained between Halcon Street and Paul Jones to allow local access to neighborhoods in the area.

Morgan Avenue – S. Staples Street to Crosstown Expressway (E12101, Bond 2012) & S. Staples Street to Ocean Drive (E13090, Bond 2014)

Beginning Wednesday, July 15, 2020, there will be a temporary intersection closure on the north side of Staples Street at Morgan Avenue for the installation of stormwater infrastructure on the Morgan Avenue Bond project. This closure will not affect east-west traffic along Morgan Avenue. However, motorists along northbound and southbound Staples Street are encouraged to follow recommend detour routes around the closure. These detours include:

  • Southbound Staples Street: Motorists are advised to right on Buford Street and follow detour signs.
  • Northbound Staples Street: Motorists are advised to turn right on Morgan Avenue and follow detour signs.
  • Morgan Avenue: continue east along Morgan Avenue and follow detour signs.

Morgan Avenue is reduced to one lane, one-way traffic flow (eastbound towards Spohn Shoreline Hospital). There is a full closure of Morgan Avenue at 3rd Street. All eastbound vehicles along Morgan Avenue will be detoured at 3rd Street. Local access to parking lots located off of Morgan Avenue, between 3rd Street and Ocean Drive, will be maintained. Access onto Morgan Avenue, off of Ocean Drive, will be prohibited.

Construction may require intermittent daily closures of local residential streets intersecting Morgan Avenue. Motorists are advised to obey warning signs and flaggers which will guide them through the work zone.

Newport Pass Road & Zahn Road (H17013 North Padre Island Beach Access Roads, Bond 2014)

Newport Pass Road has been closed to perform pavement improvements.

North Chaparral Street from Hirsch Street to Harbor Street (E12134 SEA District Pedestrian Improvements)

Brewster Street is closed to thru traffic between Mesquite Street and Chaparral Street.

Rodd Field Road – Saratoga Boulevard to Yorktown Boulevard (E15112, Bond 2014) - Update

Traffic has shifted to the newly constructed lanes on the east half of Rodd Field Road to allow the Contractor to begin reconstructing the west half. Drivers and pedestrians should expect the following traffic changes:

  • Rodd Field Road, between Saratoga Boulevard and Brooke Road, will remain TWO-WAY traffic flow.
  • Rodd Field Road, between Brooke Road and Airline Road/Slough Road, will remain ONE- WAY traffic flow in the NORTHBOUND DIRECTION ONLY.
  • Sidewalks are installed along the east side of Rodd Field between Saratoga Boulevard and Yorktown Boulevard.
  • Rodd Field Road, between Airline Road/Slough Road and Yorktown Boulevard, will remain CLOSED TO THRU TRAFFIC to make improvements to Master Channel 31 drainage structures and other roadway improvements. Motorists should continue to follow the existing signage and detour routes along Lipes Boulevard and Cimarron Boulevard.
  • The “free” right turn lane from eastbound Saratoga Boulevard to southbound Rodd Field Road will be CLOSED for reconstruction. Right turns onto southbound Rodd Field Road are permitted only at the signalized intersection.
  • TEMPORARY CLOSURE of the WESTBOUND travel lane across Rodd Field Road in order to widen the south half of the intersection of Airline Road/Slough Road. Motorists traveling westbound on Slough Road will be detoured onto northbound Rodd Field Road. Motorists traveling eastbound on Airline Road will be able to turn left (northbound on Rodd Field Road) or continue through the intersection onto Slough Road. The expected duration of the temporary closure and detour for westbound Slough Road traffic is three weeks. The traffic signal at the intersection will remain in flash mode.
  • Travel lanes along Yorktown Boulevard are opened to allow motorists to travel on both sides of the median. The traffic signal at the intersection will remain in flash mode.

GENERAL CONSTRUCTION

Greenwood Drive (TxDOT Emergency Utility Work)

Utility Contractor will continue to implement the following lane closures:

Southbound Greenwood Drive: The right lane will be closed starting approximately 600-feet north of the South Padre Island Drive Intersection. Southbound traffic will then shift to the east, into the left turn lane, and continue as one lane through the intersection.

Northbound Greenwood Drive: The center turn lane will be closed starting 600-feet south of the South Padre Island Drive intersection and continue as two lanes through the intersection.

Tancahua Street (Western Specialty Contractors)

The contractor will implement sidewalk closures to perform exterior work on the Frost Bank Building. Sidewalk closures will be in place along Tancahua Street, Buffalo Street, and Antelope Street.

More from 3News on KIIITV.com:

 

Before You Leave, Check This Out